Product
Drop in anchor | |
Standard | Inch |
Specification | 3/16"-3/4" |
Material | Carbon steel4.8grade,;Stainless steel304 |
Productive process | Wire rod→Anneal→Acid cleaning→Draw wire→ |
molding and Rolling thread→heat treatment→Surface treat→Packing | |
Surface treat | Plain,Black oxide,Blue white zinc,Yellow zinc,Hot dip galvanized,copper plating,Gold plating. |
Quality Control | Raw material inspect→process monitoring→Product test→Packaging check. |
Certification | ISO9001:2008 CE cert ROHS |
Packaging | Product bulk in plastic bag→Carton box→Wood pallet |
Application | Wind tower,Nuclear power,Railway,Automotive industry,Construction,Electronic industry |
Delivery time | 3-30days |
Payment terms | T/T 30% deposit,the balance 70% when we finish all of goods;L/C at sight,Western Union |